ABSTRACT This paper addresses the main characteristics of the AKPO FPSO. Although the FPSO is similar to other existing ones in terms of size, it is unique. Storage and Offloading unit (FPSO) of the AKPO field development, offshore Nigeria. The AKPO field is located on the Oil Mining License. (OML) offshore . The Akpo FPSO hull will have a storage capacity of two million barrels of oil and a large deck space to accommodate more than 17 topsides modules. Akpo’s.
Author: | Kigasar Tojakasa |
Country: | Bermuda |
Language: | English (Spanish) |
Genre: | Business |
Published (Last): | 15 January 2006 |
Pages: | 198 |
PDF File Size: | 3.23 Mb |
ePub File Size: | 7.58 Mb |
ISBN: | 610-1-63413-292-8 |
Downloads: | 66252 |
Price: | Free* [*Free Regsitration Required] |
Uploader: | Votaur |
Publishers Content Coverage Privacy. Akpo fields Discovered inthe Akpo field is located in ultra deepwater of Nigeria.
In AprilCameron was contracted to provide the subsea production system including the supply of Christmas trees, manifolds, connection systems, control systems and engineering. The six RB gensets are capable of providing the MW of electrical power needed to operate fpsi subsea components of the field. The subsea set up includes 22 oil and gas production wells, 20 water injection wells and two gas injection wells. The company performed a series of pre-commissioning services on the field’s flowlines and umbilicals.
Total’s Akpo Starts Producing Offshore Nigeria
This article about an oil field is a stub. Rock Mechanics Symposium and 5th U. The contract also includes EPC engineering, procurement, construction, installation and commissioning of the oil loading terminal, the FPSO mooring system and the gas export pipeline from the FPSO to the Amenam platform.
Because of these particular characteristics, it was possible to start-up the AKPO field in fpzo limited time frame ahead of schedule and without any major problems.
Some of the engineering tasks fabrication of components was carried out when the vessel reached Nigeria. Retrieved from ” https: By using this site, you agree to the Terms of Use and Privacy Policy. Proceedings of an International Conference Submersible Technology: HHI was responsible for the construction of the hull and also the construction and integration of the topside modules.
In addition, Total awarded a contract to Saipem to supply of all the umbilicals, flowlines and risers for the vessel under a turnkey basis. The Akpo hull has a storage capacity for two million barrels of oil and the deck was designed to accommodate 17 topside modules, which includes two processing trains for the separation of oil and water. Although the FPSO is similar to other existing ones in terms of size, it is unique, in some particular technical details and principals which have been incorporated in the design, such as: The subsea infrastructure consists of kilometers of a complex The topside fabrication and fitting out was completed in December and the vessel began operations at OMLapproximately km south of Port Harcourt,Nigeria in March Authors Tchigique Bernard Total S.
Field Development Beginning inthe Akpo field development project includes 44 wells — 22 production wells, 20 water injection wells and two gas injection — of which 22 have already been drilled, tied-back to an FPSO. Construction The vessel is m long, 61m wide and has facilities to accommodate crew members. From Wikipedia, the free encyclopedia.
For the initial production start-up, around half of these wells are required to be online for production and reservoir pressure maintenance purposes. The vessel is m long, 61m wide and has facilities to accommodate crew members.
Technip Awarded Wins FPSO Contract for Akpo Field in Nigeria
The reservoir fluid is a critical fluid, which implies that the fluid type is dependent on pressure, temperature and depth. The development includes 44 subsea wells 22 production, 20 water injection and 2 gas injection drilled in clustered subsea architecture.
Proceedings of an international conference Diverless and Deepwater Techology: The Akpo floating production storage and offloading vessel FPSO was commissioned in mid by Total Upstream Nigeria following the successful development of the Akpo oil and gas field, km south of Port Harcourt off the coast of Nigeria in West Africa. Proceedings of an international conference Oceanology: Pressure maintenance in the reservoirs is necessary, with water injection in 4 of the reservoirs and gas injection in one.
This article about a natural gas field is a stub. These were installed to provide electrical power for the FPSO vessel. The consortium was responsible for engineering, supply, construction, offshore commissioning and procurement of the vessel.
Technip Awarded Wins FPSO Contract for Akpo Field in Nigeria | Rigzone
Views Read Edit View history. HHI contracted Nexans to install 1,km of offshore cables for power and instrumentation infrastructure.
About us Contact us Help Terms of use. Peer reviewed only Published between: Sheriff’s Encyclopedic Dictionary of Applied Geophysics, fourth edition. Coordinates on Wikidata All articles with dead external links Articles with dead external links from October Articles with permanently dead external links All stub articles. The stabilized condensate is exported via offloading lines and a deep water buoy located 2 km away from the FPSO.
Although the FPSO is similar to other existing ones in terms of size, akpoo is unique, in some particular technical details and principals which have been incorporated in the design, such as:. Sources [ edit ] http: The Akpo development involves five reservoirs, deposited in a complex channels and lobe arrangement, situated at depth ranging from mSS to mSS.
The main automation contractor for the FPSO is Emerson Process Management who provides digital automation architecture to digitally integrate the topside module control systems. Akpo is a standalone development based fpzo a spread moored Floating Production Storage and Offloading FPSO moored in m water depth with a storage capacity of 2 million barrels of condensate.
Total’s Akpo Starts Producing Offshore Nigeria | Rigzone
Advanced search Show search help. Technip was the project akpp and was also responsible for the initial engineering phase. Proceedings of an international conference Subsea Controls and Data Acquisition ‘ Log in to your subscription Username. This Rivers State location article is a stub.